Skip to main content
Table of Contents

Harvesting in Flourish: Overview

Step-by-step guide to the harvest workflow in Flourish: set up weights, record wet and dry weights, package, record waste, and complete the harvest.

Table of Contents

Purpose

This article walks through the harvest workflow in the Grow module, from cutting plants down to completing the harvest, and links to the guide for each step.

A typical harvest moves through two stages:

  • Harvest: record wet weights right after cutting plants down. Metrc facilities sync the harvest to Metrc here. You can package wet material, such as fresh frozen, from this stage.
  • Drying: once the material is dried and trimmed, record dry weights (or declare them as you package) and create inventory packages.

When all the weight is packaged, you complete the harvest.

Using a state compliance system? Metrc facilities should also read Metrc Harvesting: Weights, Waste, Packages & Completion. BioTrack facilities follow a different workflow: see Florida BioTrack Harvesting or Connecticut BioTrack Harvesting.

1. Set Up Your Facility

Choose which wet and dry weights your facility records. Metrc facilities only need Whole weight at the Harvest stage.

2. Plan and Start the Harvest

3. Record Wet Weights

Record wet weights at the Harvest stage, right after cutting plants down.

Record Wet Weights Video

4. Package Wet Material (Optional)

If you sell or process material wet, package it from the Harvest stage.

5. Dry and Package

Move the harvest to Drying when the material is ready to dry and trim. From Drying, you can record dry weights first and package from that total, or skip that step and declare each package's weight as you create it.

6. Record Waste

Record wet and dry waste from the harvest with the Record waste action.

Recording Waste Video
View a Facility's Harvest Waste Video

7. Complete the Harvest

Complete the harvest once all of its weight is packaged. You can reopen it later if needed. For Metrc facilities, completing and reopening also finish and unfinish the harvest in Metrc.

Fix a Harvest Started in Error

Traceability and Troubleshooting

How did we do?

Choose Which Harvest and Drying Weights to Record

Contact